Cherokee Bluffs Dam Railroad Trail

(Trail near Lake Jordan)


Alternate Name(s): Forever Wild Trail

County

State

Alabama

Latitude

32.67302

Longitude

-85.90884

Description

The trail follows the old railroad bed that was built in the early 1920's and used in the construction of Martin Dam. You can follow either the Highline or Lowline railroads and proceed to the highest point in Elmore County: Saddle Rock Mountain.

The old railroad bed went from Kent, AL to build Martin Dam. The railroad was built in 1923 solely for the construction of Martin Dam by Alabama Power Company. It connected to the B&SE Railroad that went from Tallassee, AL to Eclectic, AL. When the dam was completed in 1926, the railroad was completely dismantled and the land reverted back to the landowners.

The railroad consisted of a low-line railroad that was approximately 6 miles long and a high-line railroad that was approximately 1 mile long. The trail will eventually use 4.3 miles of the lowline railroad bed and about one half (1/2) mile of the highline railroad bed. The low-line railroad trail initially will be only 2.7 miles one way until a bridge can be built across Channahatchee Creek, then it will increase to 4.3 miles and a parking lot and trailhead at both ends.

 

 



ID: 0E0D6519-58E3-4FCE-9AD1-02F6889B5E5D

Member Comments…


0E0D6519-58E3-4FCE-9AD1-02F6889B5E5D

Get Directions using Google Maps




Quick Links
Lake Jordan News
Lake Jordan Photos
Lake Jordan Videos




About Us
Contact Us
Site Map
Search Site
Advertise With Us
   
www.LakeJordan.info
THE LAKE JORDAN WEBSITE

Copyright 2024, Lakes Online
Privacy    |    Legal